CAS No.: | 38891-59-7 |
---|---|
Formula: | [CH(CH2cl)CH2o]N |
EINECS: | 38891-59-7 |
Still deciding? Get samples of US$ 4/kg
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Building Painting Floor/Metal/Pipeline Epoxy Polyester Powder Paint
Scope of application:electric appliance,electronic,machinery,food,medicine,chemical, tobacco,feed,textile,clothing, furniture,plastic,Sports supplies etc the ground of the factory workshop .
Performance characteristics:
1,Dustproof, moisture proof, wear-resisting
2,Facilitate clean ,Easy for construction,Maintenance convenient,Low cost
3,Good adhesion, good Flexibility , Impact resistance
4,Thickness 0.3-0.8mm
Use fixed number of year 3-5 years
Surface preparation |
Correct substrate preparation is critical for optimum performance. Surface should be sound, clean, dry and free from loose particles,oil,grease,and other contaminants. |
Primer |
Prepare a barrel, pour JD-D10A and JD-D10B in it based on 1:1. Stir the mixture well and then apply it with roller or trowel. The reference consumption is 0.15kg/m².The main purpose of this primer is to seal the substrate completely and avoid air-bubbles in the body coat. A second coat may be required depending on the oil absorption condition of substrate. The recoat time is about 8 hours. |
Inspection standard for the primer: even film with certain brightness. |
|
Undercoat |
Mix WTP-MA and WTP-MB based on 5:1 first, then add quartz powder (1/2 of the mixture of A and B) into the mixture, stir it well and apply with trowel. The consumption quantity of A and B is 0.5kg /sqm. You can do it one coat at one time or two coats at two times. In the second case, the application interval is about 8 hours at 25 degrees. Sand the first layer, clean it and then apply the second layer. After the whole application, wait another 8 hours, grind it, clean the sanding dust and then continue the next procedure. |
Inspection standard for the undercoat: Non-sticky to hand, no softening, no nail print if you scratch the surface. |
|
Top coat |
Mix JD-2000A and JD-2000 B based on 5:1 and then apply the mixture with spatula. The consumption quantity is 1.0kg/sqm. |
Maintenance |
5-7 days. Don't put the floor into use or wash it with water or other chemicals. |
Adhesion, level |
≤1 |
Hardness, pencil rigidity |
≥2H |
Abrasive resistance(750g,500r,CS-17)g |
≤0.04 |
Impact resistance strength ,kgcm |
50 |
Water resistance,7d |
resistance |
Resistant H2SO4,10%,7d |
resistance |
Resistant NaOH,10%,7d |
resistance |
Resistant Gasoline120#,7d |
resistance |
Construction technology:
1,Base face processing
2,Painting closed primer
3,Scraped Putty
4,Burnish, vacuuming
5,brush paint
6,Brush cover face varnish
Construction structure:
Enamel finish Paint Puttying Primer Base Surface